Painted Prairie

Aurora, CO

Multi-phase development with extensive grading, utilities, stormwater systems, and paving

Located in Aurora, CO, the Painted Prairie project is a multi-phase mixed-use development featuring extensive grading, utility installations, stormwater systems, and paving. With over 1,000,000 CY of earthwork, 130,000+ LF of water and sanitary lines, and 21 miles of sidewalk completed, the project showcases a strong partnership with the Public Improvement Authority and a commitment to quality.

This multi-year, multi-phase infrastructure project in Aurora, CO, delivered integrated wet utilities, stormwater systems, and surface improvements near a major resort and development area. Through expert coordination and consistent quality, the team successfully managed overlapping scopes, maintained the schedule, and earned repeat work with the client.

Ongoing
Client Painted Prairie Public Improvement Authority
Type Mixed-Use Development/ Stormwater Infrastructure
HEI Role General Contractor
Over 1,000,000 CY grading; 97,000 CY subgrade prep; 700,000 CY excavation to compacted embankment
50,000 LF of 8" water line; 20,000 LF of 12" water line; 30,000 LF of RCP (18"-60"); 60,000 LF sanitary water; 100,000 SY asphalt paving; 21 miles of sidewalk

Installed over 30,000 LF of reinforced concrete pipe and 150+ storm manholes

Completed 130,000+ LF of water and sanitary lines across multiple phases

Delivered over 100,000 SY of asphalt paving and 21 miles of sidewalk

Managed large-scale earthwork exceeding 1,000,000 CY

Built strong long-term relationship with Public Improvement Authority

Awarded multiple follow-on projects due to performance quality